A New “Heart” for the Lark: What a movement shortage taught me about building the watch right

Last time, I wrote about the Kickstarter that didn’t fund, and I ended it with a promise: the Lark was getting built regardless. Too many people had seen it, worn it, and told me the same thing — this is a cool piece — for me to walk away from it over a funding bar. So the plan, from the moment the campaign closed, was simple. Find a way to make it. Out of pocket if that’s what it took.

What I didn’t know when I wrote that was how much the watch itself would have to change before I could keep the promise.

 

Stepping Away Before Stepping Forward

When the campaign ended, I didn’t immediately buckle down and make the big decision. I did the opposite. For about six weeks, I tried not to think about Kickstarter, or the Lark, or watches at all. I had spent the months before the launch buried in campaign content (emails, copy, photos, the whole machine), and I needed to come up for air. So I spent time with my family. I did some leatherworking. I used my hands to make stuff that had nothing to do with the business, which is the thing that pulled me into all of this in the first place.

Then I came back and made the call. Producing Lark out of pocket was the right move, and the moment I landed on that, the fire within me was lit again. Part of it was that the decision was finally mine. I was not waiting on a crowd to tell me yes anymore. I was just going to do it. That turned out to be a much better feeling than hoping a funding bar would give me permission.

 

And Then the Ocean Got Bigger

Here’s where Murphy showed up.

The Lark was designed around the Miyota 9075 [made in Japan], which is a true GMT movement  (used for tracking a second timezone) and a good one. Initially when I reached back out to manufacturers after making my “go” decision, the news was mild. Movement pricing was ticking up a little. Not enough to scare me off, just a nudge that I should probably commit before it went higher. Fair enough, I thought.

Then it went higher. And this time it wasn’t just the price. The delivery timelines had started to stretch out on me. What had been a two-to-four-month wait became six. Then seven to nine. Then nine to twelve, with a question mark and an asterisk hanging off the end of it, and even then they would only be delivering approximately a hundred units a month.

I sat there reading these emails, trying to figure out what to do, and it was flat-out frustrating. I get it. I’m a small fish in a very large ocean, and a movement shortage doesn’t care about my timeline. But I had just finally come to terms with everything. I’d made peace with the Kickstarter results, made the decision, and gotten excited about manufacturing the Lark. And then it was as if all the wind had been let out of the sails. Now I was staring down another nine-plus months just to get these to market.

Plenty of you are probably thinking nine months isn’t that long. Maybe not. But when you’ve been living inside the design and prototype process on a watch for years, another nine months to a year on top of that is a hard pill to swallow. Part of me wondered if this was just what I got for waiting, though honestly, an order placed earlier probably would have been caught in the same mess. No way to know. Either way, I went back to the drawing board and asked myself the only question that actually mattered. What’s most important here, to the design, to the model, to the business, and, most importantly, to the customer?

 

What Lark Was Always About

To answer that, I had to be honest about something I’d spent a whole campaign marketing around.

The watch is called the Lark True GMT, and we leaned on that name pretty hard. But when I set out to design this thing, building a “true” or flyer GMT watch was never the goal. What I wanted was to use the 24-hour GMT geometry to create a field watch, something inspired by land navigation that could bridge the divide between the weekday watch and the weekend one. The office and the outdoors. It just so happened that I was able to get my hands on the Miyota 9075, which is a true GMT movement, so I ran with it. The “True GMT” ended up being a tagline I could throw into the marketing. It was a nice bonus on top of what we were already building.

So the 24-hour hand was never the point for its own sake. It was always there to be the solar compass.

Here’s how that works. On a 24-hour GMT complication, the GMT hand moves at half the rate of the hour hand. As long as your local and home time are set to match, you can point the hour hand at the sun, and the GMT hand will be pointing north or south, depending on which hemisphere you’re in. It’s a real, functional field tool built right into the dial. The one caveat is the afternoon, which is exactly why I designed the GMT hand as a bidirectional compass needle. That lets the function hold up throughout the day instead of just the morning. That feature, more than anything printed on the dial, is the soul of this watch.

 

The Fork in the Road

For anyone who hasn’t designed a watch, it all starts with the movement. The case, the dial, the hands, all of it gets designed around that one component. So when you change the movement, you’re very likely reopening decisions all the way down the chain. And that’s the part that made this genuinely stressful. Everything on Lark had already been built. The molds for the parts were made, prototyped, and proven. We knew they worked, and worked well. Changing the heart of the watch this late risked dragging the whole body along with it.

There was an easy way out, and I want to be upfront that it existed. I could have dropped to a cheaper, lesser movement, cut my costs, and still delivered a watch on a reasonable timeline.

I didn’t take it. The Miyota 9075 had already set the tone for the quality and caliber this watch was going to carry, and downgrading that component just because I could get something faster felt, to me, like a cop-out. Making a cheap watch for the sake of making a cheap watch was never the point, and I think anyone who looks at our design language already knows that. If anything, I want to give our customers more watch for their money, not less. That value is the whole reason the microbrand space is fun in the first place.

So I made the call to move from the Miyota 9075 to the Sellita SW330-2 [Swiss], the Power Plus version, named for the higher power reserve it carries over the 330-1.

Now, I’ll say this before an enthusiast says it for me. The SW330-2 is not a true GMT, and it’s not a flyer GMT. It’s a caller GMT. On paper, moving from a flyer to a caller reads like a step down in GMT sophistication, and if this were a GMT watch, it would be exactly that. But it isn’t a GMT watch. It’s a solar-compass field watch, and the compass doesn’t care how you set the 24-hour hand. It only cares that the hand runs at half the rate of the hour hand, which the Sellita does just as well as the Miyota did. The function that actually defines this watch survives the swap completely intact. What has to change is the “True GMT” wording in our marketing, because it’s no longer accurate, and I’m not going to keep a label I can’t stand behind.

And honestly? Even though it gives up the flyer function, I’d argue the SW330-2 is the better movement of the two. It’s well known, well established, tried and tested, and found in plenty of watches on the market right now. It carries a higher power reserve, 56 hours against the 9075’s 42, which is a real everyday improvement. The one bit of genuine luck in all of this is that the changes needed to fit the SW330-2 didn’t require any new molds. That saved me, and my wallet, from the exact re-tooling nightmare I’d been dreading.

The catch, and this one’s on me, is that the movement swap more than quadruples the cost of that single component.

 

Who Pays for This?

I’m comfortable telling you the movement cost more than quadrupled, and that the total cost to build each Lark has roughly doubled from where we started. Anyone can look up what a movement like this runs from a distributor and land in the right ballpark, so I’m not giving away anything. I’m telling you because I want you to understand the decision, and whatever price change comes with it.

Here’s where I come down on it. I’m a firm believer that rising costs, whether it’s tariffs or materials or all the other things quietly climbing across the whole industry, should not get reflexively passed on to the customer. My instinct is to eat some of that cost rather than forward it along. There is a line in the sand, though. I have to be able to afford to produce these up front, and I can’t lose money on the back end. Setting myself up to lose money on every unit isn’t noble. It’s just bad business, and it’s not a model that keeps Richard-Harvey alive long enough to make the next watch.

So yes, I can justify a slight bump from where we originally targeted retail. But make no mistake, with a cost change this big, I’m eating most of it myself. The public number from the campaign was $850. I haven’t officially locked the new one yet, so I’m not going to print it here. What I’ll say is this. A lot of brands run on a 3x rule, pricing retail at roughly three times production cost. Do that math on a watch whose cost just doubled, and you’d expect the price to run away from you. Ours will not. For anyone who actually knows what an SW330-2 Power Plus is and what it costs, I think the price we land on is going to come as a pleasant shock. That’s the whole idea. Make a little, spread the word, and get some really cool watches onto people’s wrists.

A quick word for the folks who backed us early. The super early bird pricing from the campaign still stands. Those backers are locked in at the number they signed up for, which sits well below both the original $850 price tag and wherever we land now. It’s less than it costs me to build the watch today, and that’s completely fine by me. They believed first.

 

Earning the Number

There’s a fairness problem hiding in all of this, though. Someone who lives and breathes movements can look at “SW330-2 Power Plus” and understand the value right away. The average customer, the person who just likes how the watch looks, sees a photo and a price tag and has no reason to know why one watch costs more than another. A movement upgrade is easy to justify to the person in the know. To everybody else, it means very little.

So while I was back at the drawing board anyway, I went through the watch one more time from the outside in, and asked myself how to make that single photo earn the price all on its own. The answer wasn’t to change the story. It was to refine how the watch was executed.

I looked at what other watches at this price point do to read as “refined,” and it’s a pretty consistent recipe. Fine brushing with some accented polishing. Lark had medium-to-fine brushing already, and the vertical brushing on the case read a little granular. The bracelet was finer. But Lark was never meant to be a dress watch, so the trick was to clean it up without dressing it up into something it isn’t. Subtle tweaks here and there, not a whole new personality.

Here’s where it lands. Polished bezel grip, crowns, chamfered edges on the clasp, and polished hour, minute, and second hands, with a fine brushing across everything else. Just enough contrast to make the whole piece read as more refined and more valuable at a glance, while still telling the same story we set out to tell. A durable, comfortable, land-navigation-inspired field watch you can wear into the office or out on an adventure, that will last a long time and is genuinely fun to wear. I can’t show you any of it yet since it’s still in progress, but that’s where we’re headed.

 

Why I Don’t Regret Taking the Long Way

If there’s one thing this whole stretch taught me, it’s that every step forward seems to come with another fork in the road. Another hurdle, another decision that, at face value, looks like it’s just slowing me down.

It would be easy to say I should have committed faster. Decided earlier. Just moved. But this was never a small decision. It’s a lot of money out of my own pocket, and I have a family, a career (not related to watches!), a home, and real bills to pay. So I took the cautious road. I took my time, and I even had to pivot in the middle of it. I don’t regret a minute of that, because taking it slow is exactly what let me cross the finish line, and it’s why I can sleep well at night. I’m certain I would have a lot more regrets going the other way. Rushing in, writing big checks, and only afterward realizing I should’ve taken one more moment before pulling the trigger.

The shortage cost me time. It didn’t cost me the watch, and it didn’t cost me my principles. I’ll take that trade every time.

The Lark is getting built. It’s got a new heart, an honest name, a new tagline, and a finish worth the price tag. And it tells the same story it always did.

More to follow.

— Mat

 